Array
Positioning

The Fincube is installed on four columns whose height is adjusted to its topographic conditions.

The construction of a Fincube is realized very sustainably and always implies that environmental intervention is reduced to a minimum. Simple soil sealing is limited to four foundation points of 0.5 m2 each and allows a gentle use and economically acceptable return of the used area.

According to the intended use, connections for cold water, rainwater, waste water, and electricity are required. Due to the installation of a photovoltaic system, the Fincube becomes an independent unit.